Skip To

  • Skip to content
  • Jump to navigation
  • Search

Page Outlines

Loading...

    Globe

    IE10 and below are not supported.

    Google Chrome Mozilla Firefox

    Contact us for any help on browser support

    You are here:

    • Home
    • Portugal Cove Road - Water Transmission Main Replacement - Phase 2

    Document Library

    • document icon Schedule - Phase 2 March 23, 2018 (391 KB) (pdf)
    • document icon Traffic Plan - Phase 2 (1.14 MB) (pdf)
    • document icon Traffic Plan - Phase 1 (869 KB) (pdf)
    • document icon General Plan - Drawing G1 (3.66 MB) (pdf)
    • document icon Construction Details - Drawing P1 (1.92 MB) (pdf)
    • document icon Construction Details - Drawing P2 (1.6 MB) (pdf)
    • document icon Construction Details - Drawing P3 (1.27 MB) (pdf)
    • document icon Construction Details - Drawing P4 (1.11 MB) (pdf)
    • document icon Construction Details - Drawing P5 (1.28 MB) (pdf)
    • document icon Construction Details - Drawing P6 (1.33 MB) (pdf)
    • document icon Construction Details - Drawing P7 (995 KB) (pdf)
    • document icon Notice To Residents - November 3, 2017 (509 KB) (pdf)